Step 1 — Wall system & analysis iDesign sequence
1. Select Sheet Pile + Cantilever Auto for a new design.
2. Enter geometry, water and surcharge.
3. Define the soil profile (Soil Profile tab).
4. Review section / embedment / M / V / deflection in Results.
5. If sheet pile fails → Soldier Pile + Lagging.
6. If cantilever still fails → Supported mode: enable supports and enter compatible reactions.
7. Select waler / prop / tie rod / tendon / raker in Supports.
8. Or select Soil Nail Wall for a FHWA GEC 11 soil nail design (nail layout, pullout, facing and block checks).

Section adequacy, minimum section & max spacing

Step 2 — Geometry, water & surcharge

Live design results

Change any input — every diagram, chart and calculation on this sheet updates instantly.

Wall cross-section

Overlay on sketch:
Click the illustration to view it full screen in a new window.

Axial forces come from the reactions entered on the Supports tab. Where a reaction is 0, a tributary-area estimate is shown and tagged (est.) — use "Estimate reactions by tributary area" on the Supports tab to adopt the estimates as design reactions.

Lateral pressure vs depth (ksf)

Shear vs depth (kip/member)

Moment vs depth (kip-ft/member)

Deflection vs depth (in)

Shear, moment & deflection — calculation table

Integration from the net line load q(z): ΔV = (q1+q2)/2·Δz (trapezoidal); ΔM = V1·Δz + (2q1+q2)·Δz²/6 (exact for linear q); support reactions apply discrete jumps to V. Deflection by moment-area/CG integration.

Step 3 — Soil profile & earth pressure coefficients

Enter layers from top down. Use User coefficients when adopting NAVFAC / Kérisel-Absi / project-specific Ka and Kp. Rankine is available for level backfill. Cohesion is listed for record but is not subtracted from pressure in this engine.

Step 4 — Wall section selection & properties

Properties are read from the section libraries.

Step 5 — Support levels & selectable components

Cantilever Auto: set all Enabled = No. Supported mode: enter the distributed horizontal reaction at each support line (kip/ft of wall). Only the parameters each support type needs are shown — unused component fields stay empty. Multi-support reactions must come from a compatible staged / structural analysis.

Fills reactions from the cantilever pressure diagram as a starting point — verify against a staged analysis.

Raker thrust-block design inputs

Preliminary concrete dead-block sizing for rakers (sliding + bearing). The PE of record verifies block location, constructability and global stability.

Wall analysis results & section check

Timber lagging design

Support component checks

Overall status

Section + embedment optimization

Each wall system is screened independently against the full library: flexure (Sx ≥ 12·Mmax/(0.66·Fy)), shear and the deflection criterion. The optimum minimizes steel quantity (or entered cost). Candidate deflection scales with Ix,selected/Ix,candidate.

Sheet pile — independent 1-ft strip analysis

Soldier pile — independent tributary-width analysis

Support depth optimization

Searches support depths (reactions re-estimated by tributary area at each trial) to minimize top deflection, construction cost, or a balanced score. Every trial iteration is listed; the best feasible (PASS) combination is highlighted. This is a screening search — confirm the chosen depths with a compatible staged analysis.

Estimate inputs

Quantities are taken off live from the current design. Rates are editable and saved in this browser.

Construction rates

Seeded from Texas public sources (TxDOT bid averages) and allowances — verify against current market before pricing work.

Materials takeoff (live)

Cost estimate (live)

Planning-level estimate only. The $/SF wall rates are all-in TxDOT averages; support $/EA lines are additive allowances — reconcile with your bid structure. Excludes design fees, dewatering, monitoring and traffic control.

03 / Installed work — Observed Texas construction unit rates

From the Texas Anchor & Shoring Design Costs reference (TxDOT statewide 12-month moving averages of low bids, updated 8 Aug 2024 — not 2026 quotes). Use to sanity-check the editable rates above.

SystemObserved rateVolume / usesEvidence
Temporary soldier pile & lagging$15.09/SF face775,075 SF · 115 usesTxDOT statewide · Item 403 6001
Temporary SPL, Amarillo District$23.63/SF face31,164 SF · 3 usesDistrict · Amarillo averages
Temporary soil-nail shoring$15.00/SF face1,145 SF · 1 useTxDOT statewide · Item 403 6002
Railroad-anchored temporary SPL$191.00/SF face2,476 SF · 1 useTxDOT statewide · single tied-back datapoint
Temporary SPL cofferdam$49.00/SF face6,516 SF · 3 usesTxDOT statewide · Item 403 6006
Steel sheet piling PZ-27$44.72/SF wall27,116 SF · 4 usesTxDOT statewide · Item 407 6001
Steel sheet piling PZ-22$35.00/SF wall2,280 SF · 1 useTxDOT statewide · Item 407 6005
Steel sheet piling PZC-18$51.00/SF wall3,454 SF · 1 useTxDOT statewide · Item 407 6019
Soil nail anchors (fascia separate)$14.64/LF nail295,852 LF · 13 usesTxDOT statewide · Item 410 6001
Rock nail anchors (fascia separate)$15.51/LF nail45,513 LF · 4 usesTxDOT statewide · Item 411 6001
Soil-nail wall fascia$35.25/SF face160,984 SF · 8 usesTxDOT statewide · Item 423 6022
Soil-nailed fascia, horizontal scheme$47.76/SF face40,919 SF · 4 usesTxDOT statewide · Item 423 6017
Rock-nailed wall fascia$34.29/SF face22,146 SF · 2 usesTxDOT statewide · Item 423 6023
Drill-shaft wall fascia$50.00/SF face12,473 SF · 1 useTxDOT statewide · Item 423 6007
Temporary retaining wall$10.51/SF face201,335 SF · 10 usesTxDOT statewide · Item 423 6003
Soil-nail wall, all-in$45.98/SF face2022 TxDOT averageNTL research report

2026 estimating ranges — shoring

RangeSystem
$18–$30/SFTemporary soldier pile & lagging
$18–$28/SFTemporary soil-nail shoring
$60–$200/SFDeep braced / tied-back urban or railroad shoring
$40–$60/SFPermanent PZ-section sheet-pile wall
$45–$65/SFSoil-nail wall, all-in
$50–$70/SFRock-nail wall, all-in

2026 estimating ranges — anchors

RangeItem
$16–$25/LFProduction soil / rock nails
$4,000–$9,000/EAStructural strand/bar tiebacks, installed and stressed (60–100 ft typical)
$50–$100/LFAlternate structural tieback unit (per LF tendon)
$2,500–$6,000/EAProof / verification tests
$2,500–$7,000/rodMarine tie-rod plus deadman

Longer or heavier tiebacks may reach $12,000+. These are synthesized Texas estimating ranges, not public bid-tab averages.

Section & component libraries

References, design basis & limitations

Calculation settings

Lagging & deflection criteria

Report branding — printed on report headers & footers

Saved in this browser and applied to the on-screen report, Print / Save PDF and Word export: logo + company name in the header, website in the footer.

Design report

Project, location, engineer, date and notes are typed directly into the report header below — click any of those fields in the header table and type.